Back to the Exchange
Catalyst template

AyniHealth TPS Catalyst Starter Package

Commission your planning system and bring it into clinical use with nothing missed.

About this programme

A staged checklist for commissioning a treatment planning system and bringing it into clinical use, running from governance and beam data through modelling, validation and go-live into ongoing QA. Owners and closure points are built in, so the vendor and the hospital work the same plan and the evidence is ready at audit. Your own protocols and vendor material load straight in while the system keeps the build visible. This is a starting structure to adapt to your own protocols, equipment and regulator requirements rather than a finished local procedure. Disclaimer for the AyniHealth Catalyst implementation checklists The AyniHealth Catalyst implementation checklists provide a starting structure for planning and managing a service build. They are starter templates rather than finished local procedures, and each centre adapts them to its own protocols, equipment, workflows and regulator requirements before use. They do not contain clinical protocols, dose values, constraints, tolerances or regulatory content, and they are not clinical, legal or regulatory advice. Any reference to a published guideline or standard is included for orientation only and must be checked against the current version and against local law and licensing. Responsibility for the accuracy, currency and safety of everything loaded in, and for every task, sign-off and clinical decision, rests with the organisation and its appropriately qualified staff, under local governance.

A look inside

    …and 1 more, unlocked when you get it